Morning Report, August 3: Northbound/Southbound 49 lane closure from N. Sidehill Viaduct to Yuba County line due to grinding operation | TheUnion.com
YOUR AD HERE »

Morning Report, August 3: Northbound/Southbound 49 lane closure from N. Sidehill Viaduct to Yuba County line due to grinding operation

California Highway Patrol — Local traffic report concluded as of 9 a.m.

*For more information on roadwork and lane closures see below.

 

Caltrans scheduled road closures:

Source: Caltrans scheduled road closures, Aug. 3.

Roadwork that may affect your commute: 

LONG-TERM PROJECTS

Interstate 80 (Placer County) from Long Ravine underpass to .2 miles east of Magra Road overcrossing: Roadwork begins for the 2.5 year, $50.6 million project to construct @ 3 miles of additional ‘truck climbing lane’ and other improvements to primarily eastbound I-80 east of Colfax including widening the Cape Horn undercrossing bridge.

July 30 – August 5

Interstate 80 (Placer County) at the Cape Horn Undercrossing Bridge:  Motorists can expect one way traffic controls for around-the-clock alternating lane closures for bridge work.

State Route 49 Slides/Slipouts (Nevada/Sierra Counties) at South Fork Yuba River Bridge to Star Lumber and Yuba/Sierra County line to Brandy City Road which will require remediation throughout the spring:

July 30 – August 5

State Route 49 (Sierra County) from Brandy City Road to Yuba/Sierra County line:  Motorists can expect signalized one way traffic controls around the clock for slipout remediation activities.

Interstate 80 – Westbound Slides (Nevada County) and risk of slides, from stateline to Hirschdale Road will require remediation throughout the spring:

July 30 – August 5

Interstate 80 – Westbound (Nevada County) k-rail will be placed around the clock to protect the right shoulder from post mile 25.5 to 26.0 for slide removal activities.

Other Long Term Projects (Sierra/Nevada/Placer Counties):

Interstate 80 (Nevada County) at the Donner Lake Road interchange: Motorists can expect detours due to full roadway closure under the I-80 overcrossings until September 1 for bridge painting.

State Route 49 (Nevada County) from north Sidehill Viaduct to Yuba River Bridge: Motorists can expect alternating lane closures and one way traffic controls from 7 a.m. to 5 p.m. Monday through Friday until after Labor Day for pavement grinding operations.

State Route 49 (Sierra County) at the Vista Point: Motorists can expect long term one way traffic controls around the clock through December 31 for emergency work to repair roadway erosion.

SHORT-TERM PROJECTS

State Route 20 (Nevada County) at the Brunswick Road overcrossing: Motorists can expect right lane closures on the overcrossing and closure of the left turn lane on the off ramps from 8 p.m.-6 a.m. Sunday night through 6 a.m. Friday July 30 – Aug 4 for paving operations.

State Route 20 (Nevada County) at the Route 20/49 junction: Motorists can expect right shoulder closures from 5 a.m. to 8 p.m. Wednesday through Saturday Aug 2-5 for sewer work.

State Route 20 (Nevada County) at the off ramp from Hwy 49 to westbound Hwy 20: Motorists can expect full ramp closure from 8 p.m. to 6 a.m. Wednesday, Thursday and Friday nights August 2-4 for sewer work.

State Route 20 (Nevada County) at Pleasant Valley Road:  Motorists can expect right shoulder closures from 6 a.m. to 7 p.m. Monday through Friday July 30-Aug 5 for shoulder work.

State Route 20 (Placer/Nevada County) from Nevada County line to Hwy 20/I-80 junction: Motorists can expect intermittent lane and shoulder closures from 7 a.m. to 5 p.m. Monday through Thursday July 30-Aug 3 for emergency work.

State Route 20 (Nevada County) at the Broad Street overcrossing:  Motorists can expect intermittent one way traffic controls from 1 a.m. to 6 a.m. Monday July 31 for striping operations.

State Route 20 (Nevada County) at Slacks Ravine:  Motorists can expect intermittent one way traffic controls from 2 a.m. to 7 a.m. Monday July 31 for striping operations.

State Route 49 (Nevada County) at the South Fork Yuba River Bridge:  Motorists can expect intermittent one way traffic controls and right shoulder closures from 4 a.m. to 7 a.m. Monday July 31 for striping operations.

State Route 49 (Nevada County) from Crestview Drive to West Empire Street (SR 49/20):  Motorists can expect right lane and shoulder closures from 7 a.m. to 5 p.m. Monday thru Friday July 31-Aug 4 for emergency work.

State Route 49 (Nevada County) from Persimmon Terrace to Nevada Street/Margurit Mine:  Motorists can expect nighttime one way traffic controls and right shoulder closures from 8 p.m. to 6 a.m. Monday night through Saturday morning July 31-Aug 5 for utility work.

State Route 49 (Placer County) from JSO New Airport Road to Education Street:  Motorists can expect shoulder closures from 6 a.m. to 7 p.m. Monday through Friday July 31-Aug 5 for shoulder work.

State Route 49 (Placer County) from JSO New Airport Rd to Education Street:  Motorists can expect nightly right lane and shoulder closures from 6 p.m. to 7 a.m. Monday night through Saturday morning July 31-Aug 5 for shoulder work.

State Route 49 (Sierra County) from Wild Plum Road to Haskell Creek Rd.: Motorists can expect one way traffic controls from 7 a.m. to 3:30 p.m. Monday through Thursday July 31 – Aug 3 for miscellaneous work.

State Route 49 (Sierra County) from the Slate Range Road to Lager Beer Sidehill Viaduct:  Motorists can expect intermittent one way traffic controls from 7 a.m. to 5 p.m. Monday thru Friday July 31-Aug 4 for emergency work.

Interstate 80 (Nevada/Placer Counties) from the Yuba Gap overcrossing to the Kingvale undercrossing:  Motorists can expect alternating lane, shoulder, and median closures from 7 a.m. to 6 p.m. Monday July 31 for guardrail repair.

Interstate 80 – Eastbound (Placer/Nevada Counties) at the Gold Run overcrossing: Motorists can expect full ramp closures from 6 a.m. to 6 p.m. Monday through Friday July 31-Aug 4 for roadway excavation.

Interstate 80 – Eastbound (Nevada County) from the California Ag Inspection Station to the 80/89N/267 Separator: Motorist can expect right lane closures from 7 p.m. to 7 a.m. Sunday through Friday July 31-Aug 4 for pavement repair.

Interstate 80 – Eastbound (Nevada County) at Old 80/89N/267 Separator, junction I-80/89S, and West Truckee undercrossing: Motorists can expect full ramp closures from 8 p.m. to 7a.m. Sunday July 30 through 6 a.m. Friday Aug 4 for pavement repair operations.

Interstate 80 – Eastbound (Nevada County) from the Donner Park overcrossing to the Hwys 80/89267 separator:  Motorists can expect nighttime alternating lane, shoulder, median and connector ramp closures from 7 p.m. to 7 a.m. Sunday July 30 to Friday August 5 for pavement repair operations.

Interstate 80 – Eastbound (Nevada County) from the Ophir Road/Hwy 193 junction to the Ophir Road undercrossing:  Motorists can expect right lane and shoulder closures from 8 a.m. to 4 p.m. Monday July 24 for guardrail repair.

Interstate 80 – Eastbound (Nevada County) from Heather Glen overcrossing to the Illinoistown overcrossing at Canyon Way:  Motorists can expect right lane and shoulder closures from 8 a.m. to 4 p.m. Monday July 24 for guardrail repair.

Interstate 80 – Westbound (Placer County) from the Nevada County line to the Emigrant Gap overhead:  Motorists can expect alternating lane, shoulder and median closures from 7 a.m. to 7 p.m. Wednesday August 2 for sign work.

Interstate 80 – Westbound (Placer County) from the beginning of the Chain-On area to the CHP Inspection Facility:  Motorists can expect alternating lane and shoulder closures from 8 p.m. to 7 a.m. Sunday July 30 to Friday August 5 for pavement grinding operations.

Interstate 80 – Westbound (Nevada County) at Donner Park overcrossing:  Motorists can expect full ramp closure from 8 p.m. to 7 a.m. Sunday July 30 through 6 a.m. Friday Aug 4 for pavement repair operations.

Interstate 80 – Westbound (Nevada County) at Old 80/89N/267 Separator, junction I-80/89S, westbound from Central Truckee, and West Truckee undercrossing: Motorists can expect full ramp closures from 8 p.m. to 7a.m. Sunday July 30 through 6 a.m. Friday Aug 4 for pavement repair operations.

Interstate 80 – Westbound (Nevada County) from Prosser Village/Overland Trail to Vista Point:  Motorists can expect overnight right lane and shoulder closures from 8 p.m. to 7 a.m. Sunday July 30 and from 6 p.m. to 7 a.m. Monday night through Friday morning July 31 – Aug 4 for pavement repair operations.

State Route 89 (Sierra County) from Placer County line to Webber Lake/Cottonwood Creek Road: Motorists can expect one way traffic controls from 7 a.m. to 5 p.m. Wednesday and Thursday Aug 2-3 for crack seal operations.

State Route 89 (Placer County) at the Truckee River Bridge: Motorists can expect overnight, intermittent, one way traffic controls from 8 p.m. to 8 a.m. Monday night through Friday morning July 31-Aug 4 for bridge work.

State Route 89 (Placer County) from at Squaw Creek: Motorists can expect overnight, intermittent, one way traffic controls from 8 p.m. to 8 a.m. Monday night through Friday morning July 31-Aug 4 for bridge work.


Support Local Journalism


Support Local Journalism

Readers around Grass Valley and Nevada County make The Union’s work possible. Your financial contribution supports our efforts to deliver quality, locally relevant journalism.

Now more than ever, your support is critical to help us keep our community informed about the evolving coronavirus pandemic and the impact it is having locally. Every contribution, however large or small, will make a difference.

Your donation will help us continue to cover COVID-19 and our other vital local news.

 

Start a dialogue, stay on topic and be civil.
If you don't follow the rules, your comment may be deleted.

User Legend: iconModerator iconTrusted User