Back to: Opinion
August 21, 2014
Follow Opinion

I-80 diversion: lower the road, don’t raise the bridges.

Regarding diverting traffic from I-80 down Highway 49:

What about lowering the roadway 16 inches? That’s a heck of a lot faster and simpler than raising all seven bridges (especially the rail crossing). Some quick digging tractor work and repaving (Hansen Bros?). Possibly a slow seven days work each? All at once? Two days of ripping up concrete. One day tractor regrading. One day pour. Three days or more concrete curing?

Caltrans can’t work that fast — if it’s a Caltrans project? Hate the thought of raising that rail bridge. Where would that traffic be rerouted? Hope to create pressure, through the media, to possibly adjust the thinking of the brilliant engineers who need those 16 inches.

Hoping to reach Jerry Brown with this idea? But, The Union should be a great starting place.

David Ward

Grass Valley


Explore Related Articles

Trending in: Opinion

Trending Sitewide

The Union Updated Aug 21, 2014 10:37PM Published Aug 21, 2014 10:37PM Copyright 2014 The Union. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.